Geotechnical Analysis and Design for the Impact of Micro Tunneling Works under an Existing Flyover
To better assess the impact of micro tunneling works under an existing flyover in the city of Riyadh in the Kingdom of Saudi Arabia, TB Associates was hired to perform a geotechnical analysis and design to ensure the safety of such works and propose mitigation measures where these works prove unsafe. The project included a geological and site assessment, sub-soil investigations, geotechnical interpretation, and the identification of ground improvements and treatment.
Location
Kingdom of Saudi Arabia
Owner
Saudi Tumapne-Engineering